Vallecitos Water District
Home Sitemap ContactInspection
The Inspection Department is responsible to provide the District's customers with professional services in the fields of construction inspection, infrastructure standards administration and USA DigAlert mark out services (facility and pipe location).
Inspectors approve and inspect private development construction projects for the public including meters and fire services. Inspectors provide the District's Capital Facilities Department with professional supervision of CIP projects throughout the construction process.
The Inspection Department takes pride in their ability to resolve project issues with integrity, efficiency, and timeliness while ensuring a quality work product is produced within the District in accordance with the approved plans, Vallecitos Water District's Standards, Specifications, Approved Materials and Vallecitos Water Board Ordinances.
Inspection Department – Contact Information and Office Hours
Inspection Hours |
Monday thru Thursday |
6:30 am to 4:00 pm |
|
Friday | 6:30 am to 3:00 pm |
Contact | Phone | ||
Inspector Supervisor |
Ricardo Cervantes |
(760) 744-0460 x 270 | |
Inspectors | John Childs | (760) 744-0460 x336 | |
Lydon Miniter | (760) 744-0460 x234 | ||
Mike Preston | (760) 744-0460 x250 | ||
Line Locator | Porfirio Hernandez (Pilo) | (760) 744-0460 x112 |
General Inspection Requirements
- Water and Sewer Inspections
- District Meter Sheet
- Contractors Emergency Contact List
- Backflow Test Certification
- Water Board Accredited Certified Labs for Bac-T Testing
- Developer Process for Final Acceptance
Pre-Construction Requirements and Acceptance of Improvements
Construction Standards
- District Standard Drawings
- Standard Specifications
- Approved Material List
- CA DEH Guidance Memo on Pipe Separation 2003
Contractor License Requirements
- cslb.ca.gov
- Contractors Qualifications VWD
- Class A: General Engineering Contractor
- C36: Plumbing Contractor
- C42: Sanitation System Contractor
USA DigAlert - 811