Master Plan

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

 

                       

 PUBLIC NOTICES:                    

                        

The Master Plan is a comprehensive document that evaluates the capacity of the existing water and sewer systems and specifies improvements necessary to serve existing and future customers. The elements studied to determine future demands are subject to change and must be periodically updated; typically a Master Plan is updated every 5 years. An accurate analysis may include many factors; regional population projections, proposed development within the Vallecitos sphere of influence, environmental impacts, lifecycle, maintenance requirements, and cost efficiency.

  

                          MASTER PLAN 2018                                                           FINAL PEIR 2018

      2018 Master Plan         2019 PEIR

 

           

 

 

MASTER PLAN FINAL PEIR SUPPORTING DOCUMENTS

A - Mitigation Monitoring and Reporting Program (MMRP)

B - CEQA Findings in Connection with the Approval of the 2018 Master Plan

C - Addendum #1 Montiel Lift Station and FM Replacement

MASTER PLAN DRAFT PEIR APPENDICES

A - NOP and Comment Letters

B - RCEM

C - Biological Resources

D - Cultural Resources

E - GHG Emissions Worksheet

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer